42 CSR 3, High-Pressure Steam Boiler and Forced Flow Steam Generator rule (eff. Jun 9, 2021). Enforced by WV Division of Labor, Boiler Safety program, statewide (oversees insurance-company inspectors). Verified on the primary source, re-checked weekly.
Boilers over 15 psi get annual internal inspections after the first one (WV Code 21-3-7); forced-flow steam generators are inspected on a schedule capped at 24 months.
Source: primary document
Statewide layer. County and city amendments sit on top; the building view resolves them from your ZIP.
In force; next CSR sunset/review Jun 9, 2031
There is no federal boiler certificate; the state program below is the whole obligation, with the ASME Boiler and Pressure Vessel Code and the National Board Inspection Code as the referenced standards.
42 CSR 3, High-Pressure Steam Boiler and Forced Flow Steam Generator rule (eff. Jun 9, 2021). Boilers over 15 psi get annual internal inspections after the first one (WV Code 21-3-7); forced-flow steam generators are inspected on a schedule capped at 24 months.
WV Division of Labor, Boiler Safety program, statewide (oversees insurance-company inspectors).
Nothing is scheduled. The rule above stays in force until the state adopts a newer edition or amends the program; AHJ Radar re-checks the source weekly.
One address, every authority that can cite it, and a record of who saw what. Cancel anytime. Public pages stay free.