NFPA 70 · 700 · Electrical

Emergency and standby power systems

A reading of NFPA 70 700 as it is commonly cited on an inspection report. The reading explains the section; it does not certify a building or close a citation. The inspector's finding and the code text govern.

MatchExact section: the decoder holds a reading for NFPA 70 700.
Evidence reviewReading prepared from the published text, NFPA 70 2023 edition; readings dated Oct 14, 2026; line-by-line source check pending. Text: NFPA free access (nfpa.org).
AdoptionWhether this standard is in force depends on the state or city that adopts it, and on the edition adopted. The decoder reads it against any of the 51 state records.
What it coversEmergency systems (Article 700) and legally required standby systems (Article 701) need to be tested and maintained on a schedule and the tests recorded; transfer switches, batteries and the generator are part of the system.
What usually closes itTest and record under load; correct failures; keep the documentation for the AHJ.
Who can do the workGenerator service contractor; trained in-house staff for the weekly inspection
Proof at re-inspectionTest records, including the transfer switch.
Read NFPA 70 700 against your stateGet the free weekly digest

Questions to ask next: which edition and section the finding is written against, in writing; what exactly was observed and what the inspector expects at re-inspection; the correction deadline on the notice. Disagree with the reading of the code? Ask the inspector for the section and edition in writing, then the fire or building official for a written interpretation.

Also in NFPA 70
110.26 · Working space around electrical equipment408 · Panelboards and circuit directories