Ch. 246-260 WAC Water Recreation Facilities (pools, spas, wading and spray pools) + ch. 246-262 WAC (water slides, wave pools and similar). Enforced by Local health officers review plans, issue construction and operating permits, inspect and enforce (WAC 246-260-021, -101, -211), with the Department of Health. Checked on the primary source; the state record was last reviewed 2026-11-12.
Ch. 246-260 WAC (chapter last updated Oct 31, 2025 per the legislature site) excludes single-family and duplex facilities for resident use, therapeutic facilities and saunas. Construction permit needed before building or altering a pool (decision within 30 days; valid 18 months). Slides and wave pools fall under ch. 246-262.
Source: primary document
Statewide layer. County and city amendments sit on top; confirm the local office for the address.
WAC 246-260 re-read Oct 15, 2026 (scope exclusions and 30-day/18-month permit terms confirmed); DOH rulemaking page and Model Aquatic Health Code alignment status not re-read
The federal Virginia Graeme Baker Pool and Spa Safety Act (drain covers and anti-entrapment) applies to every public pool alongside the state rule below.
These apply when the building has the equipment or fits the type named. The frequency is the standard one; your local official can set a stricter one, so confirm it for the address.
Ch. 246-260 WAC Water Recreation Facilities (pools, spas, wading and spray pools) + ch. 246-262 WAC (water slides, wave pools and similar). Ch. 246-260 WAC (chapter last updated Oct 31, 2025 per the legislature site) excludes single-family and duplex facilities for resident use, therapeutic facilities and saunas. Construction permit needed before building or altering a pool (decision within 30 days; valid 18 months). Slides and wave pools fall under ch. 246-262.
Local health officers review plans, issue construction and operating permits, inspect and enforce (WAC 246-260-021, -101, -211), with the Department of Health.
Rulemaking pending. WAC 246-260 re-read Oct 15, 2026 (scope exclusions and 30-day/18-month permit terms confirmed); DOH rulemaking page and Model Aquatic Health Code alignment status not re-read
Free reference. No account is needed. Membership — Coming soon.