Labor Law sec. 204 + Industrial Code Rules 4 and 14 (12 NYCRR Parts 4, 14); ASME code, current edition and addenda. Enforced by NYS DOL Boiler Safety Bureau and DOL-certified insurance-company inspectors; qualifying cities may enforce sec. 204 themselves; boilers serving dwellings of fewer than six families and low-pressure boilers under 100,000 BTU/hr are exempt. Verified on the primary source, re-checked weekly.
Covered boilers need a certificate of inspection (valid 12 months high-pressure, 24 months low-pressure). Intervals: high-pressure steam internal/external yearly; low-pressure steam external 2 yrs, internal 3 yrs; low-pressure hot water external 2 yrs, internal 5 yrs.
Source: primary document
Statewide layer. County and city amendments sit on top; the building view resolves them from your ZIP.
In force (DOL synopsis last updated Dec 17, 2024); no pending rule found
There is no federal boiler certificate; the state program below is the whole obligation, with the ASME Boiler and Pressure Vessel Code and the National Board Inspection Code as the referenced standards.
Labor Law sec. 204 + Industrial Code Rules 4 and 14 (12 NYCRR Parts 4, 14); ASME code, current edition and addenda. Covered boilers need a certificate of inspection (valid 12 months high-pressure, 24 months low-pressure). Intervals: high-pressure steam internal/external yearly; low-pressure steam external 2 yrs, internal 3 yrs; low-pressure hot water external 2 yrs, internal 5 yrs.
NYS DOL Boiler Safety Bureau and DOL-certified insurance-company inspectors; qualifying cities may enforce sec. 204 themselves; boilers serving dwellings of fewer than six families and low-pressure boilers under 100,000 BTU/hr are exempt.
Nothing is scheduled. The rule above stays in force until the state adopts a newer edition or amends the program; AHJ Radar re-checks the source weekly.
One address, every authority that can cite it, and a record of who saw what. Cancel anytime. Public pages stay free.