7 CCR 1101-5 Boiler and Pressure Vessel Regulations (CDLE OPS), amended effective Jan 1, 2026. Enforced by CDLE Division of Oil and Public Safety Boiler Inspection Program; state inspectors or commissioned special (insurance company) inspectors. Reported, in verification, re-checked weekly.
Covers boilers and some pressure vessels in commercial and public buildings. Power and high-temperature water boilers: annual inspections; ASME Section IV heating boilers, hot water supply boilers and covered water heaters: every two years (mirror text through Jun 2025).
Source: primary document
Statewide layer. County and city amendments sit on top; the building view resolves them from your ZIP.
In force; content of the Jan 1, 2026 amendments not read
There is no federal boiler certificate; the state program below is the whole obligation, with the ASME Boiler and Pressure Vessel Code and the National Board Inspection Code as the referenced standards.
7 CCR 1101-5 Boiler and Pressure Vessel Regulations (CDLE OPS), amended effective Jan 1, 2026. Covers boilers and some pressure vessels in commercial and public buildings. Power and high-temperature water boilers: annual inspections; ASME Section IV heating boilers, hot water supply boilers and covered water heaters: every two years (mirror text through Jun 2025).
CDLE Division of Oil and Public Safety Boiler Inspection Program; state inspectors or commissioned special (insurance company) inspectors.
Nothing is scheduled. The rule above stays in force until the state adopts a newer edition or amends the program; AHJ Radar re-checks the source weekly.
One address, every authority that can cite it, and a record of who saw what. Cancel anytime. Public pages stay free.