Florida milestone inspections and SIRS: the 2026 numbers

Two official documents now say how Florida's post-Surfside building laws are working. The Legislature's research office counted the milestone inspections required and completed in 2024 and 2025, and found 54 buildings declared unsafe or uninhabitable, most of them not vacated. The Division of Condominiums counted the associations that had filed a structural integrity reserve study a month before the deadline: 7,836, against 16,104 that had opened the required online account.

Sources: Florida Legislature, Office of Program Policy Analysis and Government Accountability, Milestone Inspection Reporting Data, 2024 and 2025, Report 26-04, July 2026 (DBPR data received through March 31, 2026); Florida DBPR, Division of Condominiums, Timeshares and Mobile Homes, Compliance with HB 913 (2025) Requirements, December 1, 2025 (figures as of November 30, 2025). Last checked by AHJ Radar: November 4, 2026.

Milestone inspections, as reported to DBPR

Local building officials report milestone inspection activity to DBPR each year. OPPAGA's figures are only as complete as that reporting, which is the second finding below.

Measure20242025Both years
Phase one inspections required8,7772,880
Phase two inspections required1,899636
Phase one completed6,9521,7848,736
Phase two completed1,3012741,575
Extensions granted8187691,587
Permit applications for phase two repairs671232903
Buildings found unsafe or uninhabitable302454, in eight counties
Jurisdictions that reported to DBPR71% (277 of 389)64% (250 of 389)

OPPAGA's own sentences carry the findings: "Most required phase two milestone inspections were for buildings located in coastal counties and municipalities." "Milestone inspections identified 30 buildings in 2024 and 24 buildings in 2025 as unsafe or uninhabitable." "Building officials reported that most buildings determined unsafe or uninhabitable were not vacated." On reporting, Walton County's submission was not included as of March 2026 after repeated contact, and for 2025 seven of 31 municipal building officials in Broward, seven of 34 in Miami-Dade and 17 of 39 in Palm Beach did not report.

SIRS filings a month before the deadline

The 2025 law (HB 913) required every condominium association to open an online account with the Division by October 1, 2025 and to complete its structural integrity reserve study by December 31, 2025. As of November 30, 2025, the Division reported 16,104 associations with an account and 7,836 that had reported completing a SIRS. The Division wrote that it "has not received any formal notifications of noncompliance" and that it regularly receives inquiries from associations seeking clarification about SIRS reporting. The document does not state the total number of associations subject to the requirement.

What this means for a condominium board or manager

IfThen
Your building is three stories or more and 30 years old (25 within three miles of the coast)Phase one was due; if the report found substantial structural deterioration, phase two and the repair permit follow, and the permit application is itself a reported number
Your phase two report named repairsExpect the building official to track the permit; 903 such applications were filed in two years
Your association opened the DBPR account but has not filed the SIRSYou are in the gap between 16,104 and 7,836; the Division had not sent noncompliance notices as of December 2025, which is not the same as the obligation lapsing
Your municipality is one that did not reportDBPR's record of your building may be blank; keep the inspector's report, the local acceptance letter and any extension in the association's own records

Confirm every date and threshold with the local building official and the association's engineer; the statute's triggers and the local enforcement schedule control, not this summary.

What is not on this page, and why

OPPAGA's report does not name the 54 buildings or the eight counties in the text read for this page, and does not define "uninhabitable" (the statute does not either). The Division's December 2025 document is a progress count, not a compliance rate; the next DBPR annual report should give the denominator. Neither document reports the cost of phase two repairs.

Keep this current. The free digest carries the next release of this data the day it is published, a reminder before each deadline, and the Monday issue of everything that changed, each with its official source.
Get the free digest

AHJ Radar™ is a trademark of Mason Mathews Facility Assurance, LLC. Official sources read daily since September 2026; every entry names its source. Content and compilations © 2026 Mason Mathews Facility Assurance, LLC, for personal and internal use under the Terms of Use; no redistribution or resale.

Reference only. This page restates a published official document; it is not legal advice and not an assessment of any property. Confirm requirements with the official text linked above, your authority having jurisdiction and your own counsel. Mason Mathews Facility Assurance, LLC · all reference pages · how our monitor reads sources.