NFPA 25 · 15 · Fire protection

Impairments (Chapter 15)

A reading of NFPA 25 15 as it is commonly cited on an inspection report. The reading explains the section; it does not certify a building or close a citation. The inspector's finding and the code text govern.

MatchExact section: the decoder holds a reading for NFPA 25 15.
Evidence reviewReading prepared from the published text, NFPA 25 2023 edition; readings dated Oct 14, 2026; line-by-line source check pending. Text: NFPA free access (nfpa.org).
AdoptionWhether this standard is in force depends on the state or city that adopts it, and on the edition adopted. The decoder reads it against any of the 51 state records.
What it coversA system out of service needs an impairment tag, notice to the fire department and the insurer, and a fire watch or other measures while it is impaired.
What usually closes itTag the impairment, notify the AHJ and the insurer, keep a fire watch until restored, and log it.
Who can do the workOwner staff; no license required for this task
Proof at re-inspectionImpairment log and the notices.
Read NFPA 25 15 against your stateGet the free weekly digest

Questions to ask next: which edition and section the finding is written against, in writing; what exactly was observed and what the inspector expects at re-inspection; the correction deadline on the notice. Disagree with the reading of the code? Ask the inspector for the section and edition in writing, then the fire or building official for a written interpretation.

Also in NFPA 25
4.1 · Owner responsibility and records5.1 · Sprinkler inspections not done or not documented5.3 · Sprinkler tests overdue5.4 · Sprinkler maintenance deficiency6 · Standpipe deficiency7 · Private fire service mains and hydrants8 · Fire pump testing13 · Valves, alarm devices and fire department connections14 · Internal pipe inspection and obstruction